Information    |    Capstone Document Repository    |    Past Projects    |    Progress Towards Registration

Past Projects

Production Operation Improvements

Arnaldo Rivera Sepúlveda; Ivis Izquierdo Melo – This project provided evidence that for the special case studied, a batch processing work method maximized production output by 4.54% when compared to a continuous flow operation by reducing idle time and distances between workstations.

Details